Improvements

Roof30 years limited warranty shingle2005
A/C 2004
Furnace100,000BTU2004
Water softener 2005
Dehumidifier70 pint/day in basement2013
Pool & trex decking16’x32′2006
Pool pump and filter 2006
Lawn sprinkler3 zones2006
   
Basement Ceiling 2007
Installed condensation removal pump to furnace2007
Replaced basement stair steps2010
Installed crawl space poly vinyl vapor barrier cover2007
Remolded 1st Fl 1/2 bath 2013
Remolded 2nd Fl full bath 2013
Installed master bath toilet 2014
Front entrance tile 2013
Kitchen Appliances-SS French door refrigerator2007
 – SS double wall oven2007
 – SS dishwasher2014
 – Electric stove top2014
 – SS range hood2014
Kitchen laminate floor2007
Washer & electric dryer2007
1st Fl and 2nd floor refinished hardwood floor2007
1st Floor added Crown molding2012
National Grid service entrance cable replaced and added circuit breaker2012
Low voltage landscape lighting2010